Support

Support from engineers. Response times in the contract.

Each account has a named engineer and a shared channel with the NOC. The person who answers can read a SIP trace and move your traffic to another route.

Example incident log
  1. Alex, Voxiis NOC

    Hi! Heads-up: one of our carriers started failing calls to Nigeria mobile, the 0803 and 0806 numbers. Monitoring moved your traffic to a backup route at 14:01, so nothing to do on your side.

  2. You

    Thanks, good to know. Calls look fine on our end.

  3. Alex, Voxiis NOC

    All fixed: the carrier sorted it out and the route is back in rotation. I'll send you the incident report shortly.

The switch was automatic. You heard about it from us.

Response

First response by priority

  • P1Outage

    15min

    Calls failing, no audio

    24/7

  • P2Degraded

    1hour

    ASR drop, one-way audio

    24/7

  • P3Request

    4hours

    New route, number order

    business hours

Channels

  • Telegram
  • WhatsApp
  • Email
  • Phone

Reporting

What to send when something breaks

With the first three the NOC can find the call without asking again.

or email it to support@voxiis.com

  1. The number you dialed

    In full international format: +234 803 XXX XXXX

  2. Time of the call

    To the minute, in UTC: 8 Nov, 14:02

  3. What happened

    No ringback, no audio, one-way audio, wrong caller ID or a dropped call

  4. Call-ID or a CDR line

    From your dialer or PBX log, if it shows one

  5. A SIP trace

    For signalling problems: a pcap or a text trace

Escalation

Who to go to next

  1. Your engineer

    The first line for everything. Knows your setup, reads traces and changes routes.

  2. NOC shift lead

    If you have no update within the response time for the priority.

  3. Head of NOC

    If the shift lead has not resolved it. The contract lists the contacts for each level.

Test us as your second carrier for 7 days.

  1. 1

    Create an account in the customer portal.

  2. 2

    Pass KYC and get test credit, usually within one business day.

  3. 3

    On day 7, get a report with HAR, ASR, ACD and PDD for each route.